Carrying out comprehensive surveys for the development of project documentation
In January 2025, the company's employees performed a number of comprehensive engineering-geodetic and engineering-geological surveys to develop project documentation (stage "Project" and "Working documentation") at various facilities in Kyiv and Vinnytsia regions to carry out major repairs of facilities.
Works on the section of the Urengoy–Pomary–Uzhgorod highway at the crossing over the Boguslav–KS35 Stavyschenska highway
Comprehensive engineering-geodetic and engineering-geological surveys for the development of design documentation on the section of the Urengoy–Pomary–Uzhgorod gas pipeline at the crossing over the Boguslav–KS35 Stavyschenska highway in the Kyiv region.
Overhaul of the section of the Urengoy–Pomary–Uzhgorod gas pipeline Du1400 at the crossing over the Boguslav–KS35 Stavyschenska highway involves bringing the gas pipeline crossing over the highway in line with the requirements of SNiP 2.05.06–85, by constructing a new section and connecting it to the existing Urengoy–Pomary–Uzhgorod gas pipeline.
For this purpose, the following works were performed:
- collection and systematization of materials of triangulation, trilateration and polygonometry networks on the object;
- tacheometric survey at M 1:1000;
- comprehensive engineering and geodetic surveys on undeveloped territory with the preparation of plans at a scale of 1:1000;
- surveying of underground communications using a pipe and cable locator;
- preparation of a profile at a scale of 1:1000.
Works at the overhaul site of the Soyuz metro station at the crossing over the Vyscha Kropivna to Uman–Vinnytsia highway in Vinnytsia region
included:
- collection and systematization of materials for triangulation, trilateration and polygonometry networks by object;
- search for polygonometry signs using devices;
- tacheometric surveying at M 1:2000;
- comprehensive engineering and geodetic surveys on undeveloped territory with drawing up plans at M 1:1000;
- surveying of underground communications using a pipe and cable finder;
- drawing up a profile at M 1:1000.
The overhaul of the section of the Soyuz gas pipeline Du1400 at the crossing over the Vyscha Kropivna to Uman-Vinnytsia highway involves bringing the MG crossing over the highway in line with the requirements of SNiP 2.05.06–85 by constructing a new section and connecting it to the existing Urengoy–Pomary–Uzhgorod gas pipeline.
At the overhaul site of the Soyuz metro station at the crossing over the Vinkivtsi–Yaltushkiv highway in Vinnytsia region
the following engineering-geodetic and engineering-geological surveys were carried out:
- collection and systematization of materials of triangulation, trilateration and polygonometry networks on the site;
- search for polygonometry signs using devices;
- preliminary surveys of the pipeline route;
- tacheometric survey at M 1:2000;
- comprehensive engineering-geodetic surveys on an undeveloped territory with the preparation of plans at M 1:1000;
- preparation of a profile at M 1:1000.
The overhaul of the section of the Soyuz main gas pipeline Du1400 at the crossing over the Vinkivtsi-Yaltushkiv highway involved bringing the MG crossing over the highway in line with the requirements of SNiP 2.05.06–85 by constructing a new section and connecting it to the existing Soyuz main gas pipeline.