Topographic and geodetic works on updating the General plan
IT-Transit company together with its partners, has won a tender on update the general plans for the SIBUR petrochemical group - Sibur-Neftehim JSC, as well as the Biaxplen LTD subsidiary - settlemen Hydrotorf, and carried out a complex of topographic and geodetic works, including field and cameral work on updating and creating general plans for petrochemical plants.
Sibur-Neftehim ОJSC
Actualization and new topographic survey with a total area of 74, 68 ha, including the following plots:
- Plot No. 1 cable line 110 kV on the KEES-331 project, passing through the territory Sibur-Neftehim JSC with an area of 1.07 ha - a correction of the top-plan of 1: 500 scale with the height of the relief section 0.5 m, strip width - 10 m to each side of the outermost cable in the corridor, taking into account existing materials.
- Plot No. 2 cable line 110 kV and distribution center 110 kV on the KEES-331 of 4.63 ha – a new survey of 1: 500 scale with a relief section height of 0.5 m, a strip width - 20 m to each side of the outermost cable in the corridor.
- Plot No. 3 aerial line 110 kV on the KEES-331 project from Tosol-Sintez switchgear to an Federal Sales Company OSG of 25.92 ha - a new survey of 1: 500 scale with a relief section height of 0.5 m, a strip width - not less than 40 m in each direction from the outermost wire.
- Plot No. 4 overpass No. 7 from the fence of the POEiG site and overpass to the Dzerzhinskaya TPP, with an area of 27.31 ha - actualization the existing survey of 1: 500 scale with a relief section height of 0.5 m, taking into account existing materials.
- Plot No. 5 steam technological overpass from the POEiG site to the PAKiE site, with an area of 15.75 ha - a new survey of 1: 500 scale with a relief section height of 0.5 m, a strip width of 25 meters from the steam pipeline axis in each direction.
List of work performed:
- Preparatory work includes the collection, research and analysis of existing materials and documents
- Field work includes:
- Field data collection on the spatial position of in-site and out-site engineering structures of the Sibur-Neftehim JSC facilities
- Complex of field topographic and geodetic works
- The cameral works complex on actualization the general plans of Sibur-Neftekhim JSC includes:
- Processing executed topographic and geodetic works, processing and summarizing the provided segmented cartographic data of territories
- Draft compilation of communication wells, support of power transmission lines and technological trestles cuts, processing digital photography
- The work results include:
- General plans in the sites digital form of POEiG, PAKiE of scales 1: 500, 1: 2000, 1: 5000
- Consolidated general plan all sites of Sibur-Neftekhim JSC, in-site communications and off-site objects
- Cadastral plans for the territories quarters
- Situational plans for industrial sites, Total Situational Plan for scale
- Plane table territory industrial sites
- Longitudinal tracks profiles of the steam line and cable line
- Albums of wells drafts and cuts technological overpasses
- Technical report on the works performed
Plant "Biaxplen"
Subsidiary of the petrochemical group SIBUR.
Execution of topographic and geodetic works and actualization the general plan of the plant at a scale of 1: 500, with an area of 17.8 ha:
- Preparatory works on the processing and systematization of data
- Topographic and geodetic works:
- Reconnaissance of territories
- Creation of a supporting geodesic network (polygonometry 2 digit, IV class levelling)
- Preparatory topographic survey M 1: 500, including survey all buildings and structures, determining the height and laying of communications and an indication of their technical characteristics
- The statement of real estate objects statement formation, coordinates catalog and fixed points heights, schemes of planned and high-altitude justifications, photos and cards of points bookmarks
- Topographies matching with the services of the customer’s engineering networks and network owners
- Cameral works:
- Processing field survey results
- Land and cadastral works
- Technical report
- Formation of the general plan M 1: 500