2025
Complex works for LLC “GTS Operator of Ukraine” under Application 2
15.12.2025
In December 2025, the IT-TRANSIT company completed works under the Contract for Application 2 from LLC “GTS Operator of Ukraine” to develop a spatial database of topographic objects of surrounding the linear part of main gas pipelines, which included the following thematic blocks: Formation on the Contractor’s landscape (spatial database) and the Customer’s data […]
Engineering work on the development of design and working documentation for GDS No.7 has been completed
23.04.2025
Comprehensive surveys have been completed for the development of design and working documentation for the object “Reconstruction of electrical networks of gas distribution station No. 7 in Dnipro”. The purpose of the work was to obtain initial data for the development and justification of design documentation, which provides for a design solution for the installation […]
Closing of the 8th stage of engineering works on the filling of the software product “Information and analytical system for managing the technical condition and integrity of objects of pipeline-transport networks ITT-PIMS”
15.04.2025
In accordance with the agreement between the company “IT-TRANSIT” and LLC “GTS Operator of Ukraine” on the development of a spatial, passport-technical and repair-diagnostic database for objects of the linear part of the main gas pipelines of Ukraine to fill the software product “Information and analytical system for managing the technical condition and integrity of […]
Update of the ITTPIMS test landscape
12.04.2025
In the current development, IT-TRANSIT specialists refactored the following modules of the IAS OGTSU system:: Calculations; Repair planning; VTD polisher; Defect assessment; Risk assessment; Map; Passport; Metadata editor. Based on the results of the work, a Technical Report was compiled whitch submitted to the Customer within the specified time frame.
Carrying out comprehensive surveys for the development of project documentation
24.01.2025
In January 2025, the company’s employees performed a number of comprehensive engineering-geodetic and engineering-geological surveys to develop project documentation (stage “Project” and “Working documentation”) at various facilities in Kyiv and Vinnytsia regions to carry out major repairs of facilities.
Implementation of comprehensive engineering surveys at the Obukhiv GDS facility
6.01.2025
A complex of engineering-geodetic and engineering-geological surveys for the development of project documentation (stage “Project” and “Working documentation”) for the object: “Reconstruction of metering, gas purification and switching units of the gas distribution station “Obukhov” in the Obukhiv district of the Kyiv region was performed in January 2025. in order to obtain initial data. construction […]